Our new neighbors have been looking at our eyesore of a home for about 3 weeks. We were excited when the Vinyl siding was removed and we found cedar clapboard under it. We were planning on cedar clapboard as our siding on the new house and hoped the original could be patched and salvaged. Wrong. It has to be removed also because it is so deteriorated. The side room seen on the left of the main house in the front view and on the right in the rear view was found to be inadequately constructed has to be rebuilt to comply with new standards. We are hoping to keep as much of the existing hardwood floors as possible. They appear to be in pretty good condition, having been carpeted for most of their life.
The interior of the house was gutted down to the studs and all the existing wiring and plumbing was removed. In an attempt to keep cost down ( which are already estimated to be 30-50% over our absolute max for the project).
North side, driveway side with new entrance
|
Rear of house |
With some luck, we are expecting the building go ahead before the end of next week.
Of course the most important thing that happened during the past 3 weeks was the arrival on my grandson Michael.
Pop, Joe, Michael, Cate, Meg,Mamo, Michael's escort from Korea |
The Zambrano Family |
He arrived on July 3rd from Korea. I was lucky to have the day off and an invitation to go to Newark Airport and meet him at his arrival home.