Manasquan Borough finally issued the building permit on Thursday 8/23. The date correction on the permit makes it look like it was ready on the 22nd. I quess it would have been difficult to put in the date and call the owner (me) on the same day. So, they put in the date called me on the 23rd, and changed the date to reflect their ineptitude.
The mason showed up bright and early on Monday the 27th. I got to the house to see the mark-out of the new addition and the start of the foundation digging
and the Bilco doors
An hour long and very intense thunderstorm stopped the digging at about 1PM but a good stab at the project was completed before the hole filled with water.
View of addition from the left rear of the property. |
Looking forward from the new rear wall of the house. |
At the end of the day-finally an idea of the size and location of the addition. With some good weather and some hard work, I'm told to expect to be closed in by the end of Sept.
View of the addition from the existing rear entrance of the house. |
2 comments:
It's exciting to see things moving along! The addition looks really BIG!! Can't wait to fill that new space with sandy feet. I am a little concerned that the plans do not reflect the location of the Manasquan bimini hook. E
Ran into Ronnie at Front Porch. She filled me in on family plus your blog. Looks like your beach house will be an amazing place. You have a beautiful family! All the best.
Jeanne 102. P.S. How many houses have you guys owned since 104??
Post a Comment